Mining Plant Liquidation & Dismantlement for Tronox
Project Overview
In 2013, Tronox, in partnership with two other trona producers in Green River, Wyoming, constructed a state-of-the-art Beneficiated Milled Trona (BMT) Plant to manufacture a specialty product for the power generation industry. Despite the significant investment, changing market conditions led to the facility ceasing operations after only a few months.
Located within Tronox's active Green River mining complex, the BMT facility consisted of three interconnected processing plants—Ore Handling, Beneficiation, and Milling—linked by miles of elevated conveyors that crossed multiple active operating areas. The complexity of the site, combined with ongoing mining operations and stringent MSHA safety requirements, made dismantling the plant a highly specialized undertaking.
In 2016, the ownership group established a firm deadline to completely remove the facility, including all equipment, structural steel, concrete foundations, pedestals, and footings, while maximizing the value of the plant's remaining assets.
Phoenix Equipment was selected to execute the project.
The Challenge
This project required far more than conventional demolition.
The successful contractor needed to:
Safely dismantle a complex industrial processing plant located within an active mining operation.
Operate under strict MSHA regulations without disrupting adjacent production facilities.
Recover maximum value from more than 100 pieces of specialized mining equipment.
Coordinate the removal of several miles of elevated conveyor systems spanning multiple operating areas.
Complete the project safely while meeting an aggressive project schedule.
Phoenix Equipment's combination of industrial dismantling expertise, global equipment marketing capabilities, and proven safety performance made us uniquely qualified for the assignment.
Why Phoenix Equipment Was Selected
Phoenix Equipment had previously completed a successful transaction at the Green River site, purchasing and relocating an entire sodium cyanide plant for reuse. That experience established confidence in our ability to safely execute complex projects while maximizing asset recovery.
Following a competitive bidding process, Phoenix Equipment was awarded the BMT dismantlement project because we:
Offered the highest overall equipment and salvage value to Tronox.
Demonstrated extensive experience working in active MSHA-regulated facilities.
Developed a comprehensive asset recovery strategy designed to maximize resale value.
Provided complete turnkey project management from dismantling through equipment sales and scrap recycling.
Asset Recovery Strategy
Rather than viewing the facility as scrap, Phoenix Equipment recognized the significant market value of the nearly new processing equipment.
Before dismantling began, our sales and marketing team launched an international marketing campaign targeting mining companies, mineral processors, and industrial buyers seeking high-quality used equipment.
This proactive approach enabled Phoenix Equipment to:
Sell numerous pieces of equipment directly from the operating site.
Carefully dismantle and preserve equipment for relocation.
Transport remaining assets to our storage facilities for continued marketing and resale.
Significantly increase the total return generated from the project.
By combining industrial dismantling with equipment remarketing, Phoenix transformed a demolition project into a comprehensive asset recovery program.
Equipment Successfully Recovered
Phoenix Equipment safely dismantled, rigged, and removed more than 100 pieces of process equipment, including:
(2) Williams DF-85 Fluid Bed Roller Mill Systems
(2) Tomra Commodas Ultrasort Pro Secondary XRT C1200 Sorters
General Kinematics STM 96x2 Single Deck Vibratory Screener
McLanahan Double Roller Crusher (Model BDDR2448007)
McLanahan Apron Feeder (48" x 17'6")
Gundlach Roll Crusher
Several miles of elevated conveyor systems
Numerous material handling systems, structural components, and ancillary process equipment
Every piece was evaluated for resale, relocation, or recycling to maximize value recovery.
Safe Dismantlement Execution
Phoenix Equipment coordinated all dismantlement activities through experienced subcontractors while providing complete project oversight and management.
Over approximately 10 months, the team safely completed all dismantling operations without a single injury or safety incident.
Work included:
Equipment rigging and removal
Structural steel dismantling
Process plant demolition
Conveyor removal
Concrete foundation demolition
Scrap processing and recycling
Site cleanup and restoration
Maintaining an outstanding safety record while working inside an active mining operation was one of the project's greatest accomplishments.
Project Results
Asset Recovery
100+ pieces of process equipment recovered
3,500+ tons of carbon steel recycled
Millions of dollars in equipment remarketed for reuse
Equipment sold both directly from the site and through Phoenix Equipment's global sales network
Dismantlement
Complete plant dismantlement
Removal of all foundations and footings
Miles of conveyor systems removed
Zero recordable injuries or incidents
Project completed safely and on schedule
Phoenix Equipment's Advantage
Industrial plant closures don't have to end with demolition and scrap.
Phoenix Equipment specializes in maximizing the value of industrial assets by combining:
Industrial plant dismantling
Global equipment remarketing
Asset recovery consulting
Rigging and heavy lifting
Scrap management
Turnkey project execution
Our approach consistently delivers higher returns than demolition alone by identifying resale opportunities before dismantling begins.
Whether it's a mining operation, chemical plant, refinery, power facility, or manufacturing plant, Phoenix Equipment helps owners recover maximum value while executing projects safely, efficiently, and on schedule.