There are two identical cogeneration power plants. Each one is 62.5 MW output. Both plants were commissioned in 1996 and shut down in 2012. Gas turbine generator was supplied by Siemens (2x SGT 600, former ABB/Alstom GT 10). Power output & efficiency: 2x 24,77 MW; 34,2 %. Steam turbine generator is ABB Stall (condensing with extraction). Power output: 12 MW. Steam parameters: 510/195 degree celsius, 83/8 bar, 20/4 kg/s. Combined efficiency: 49,6 %. Fuel utilization: Natural gas. Heat output level: MP: 100 degree celsius, 2 bar, 15 kg/s; LP: 71 degree celsius, 1 bar; 7 kg/s.