There are two identical cogeneration power plants. Each one is 33.9 MW output. One plant was operated from 1994 to 2012, the other from 1996 to 2013. Gas turbine generator was supplied by Siemens (2x SGT 600, former ABB/Alstom GT 10). Gas turbine generator power output & efficiency: 2 x 24.77 MW; 34.2 %. Steam turbine generator is ABB Stall (condensing with extraction). Steam turbine power output: 10 MW. Steam parameters: 500/197 degree celsius, 55/4 bar, 10/2 kg/s. Combined efficiency: 49.9 %. Fuel utilization: Natural gas. Heat output level: MP: 205 degree celsius, 11 bar, 25 t/h.